Foamed Bitumen (Produced by injecting water and air into bitumen resulting in foaming)

Milling of existing surface. Spread cement and aggregate as provisioned in the mix design

Pulverize existing DBM layer till the bottom of cracked Asphalt layer. Cold Recycling with a combination of RAP + virgin bitumen + OPC

Grading of pulverized layer and Treat In situ with WR 240 with Foamed Bitumen to stabilized Pulverized layer

Compact using heavy roller soil compactor (Pneumatic and sheep foot roller) to achieve required density

Tack coat over recycled surface and Wearing course provided over cold recycled surface